Post

Work Log: 2026-05

/// Under construction ///

Work Log: 2026-05

Info:

  • This is an append-only work log.
  • Main purpose: help future me resume work quickly.
  • Public readability is useful, but this is not a polished monthly report.
  • You can say this is a AGENT.md/CLAUDE.md/GEMINI.md for my future self.

Rules:

  • Keep entries date-stamped and in chronological order.
  • Record changes, decisions, risks, and the next actions.
  • Keep private life, job-process details, and sensitive experiment details out.
  • If one section grows too large, split it into a standalone post later.

Resume Here

Last updated: 2026-05-11 14:38 JST.

Current State

  1. Research:
    • Levels journal-grade diagnostic chain.
    • BP4D++ dataset label limitations for stress estimation, may affect the experiment design.
    • Review the possibility of VLM/LLM for emotion recognition for next research direction.
  2. Job preparation:
    • Review 2 past exam question sets.
  3. New Blog
    • Design is mostly ready, need backend.

Do Not Forget

  • Do your LeetCode/acm practice.
  • Must do research.

Current Next Actions


Standalone Candidates

  • BP4D++ label limitations for stress estimation
  • BP4D++ dataset overview and preprocessing for stress estimation
  • Review of VLM/LLM for emotion recognition and hardware requirements.

project

New Blog / Research

Done

Decision

Risk

Next


2026-05-16

project

New blog design «««< HEAD

Done

  • Finalized most of the design.

Decision

  • None.

Risk

  • DO MORE LEETCODE/ACM.

Next

  • finish research and journal paper.

2026-05-15

project

New blog design / Research

Done

  • Astro blog 4 iterations.
  • Made a levels experiment final journal-grade diagnostic chain.
  • Rewrite README.md for research for journal.

Decision

  • We can not make a levels experiments work using current model.

Risk

  • Should go for lower level place for journal.

Next

  • Finish the diagnostic chain.

2026-05-13

Project

Experiment result investigation / Context file manage

Done

  • Reconstructed md memory files.
  • Added single seed investigation script.
  • Made some investigation for low performance issue.
  • T3 low/high does not have strong signal, binary feature screening of logreg/linear_svm showed even contact BVP macro-f1 is 0.5596.
  • z-score/no z-score in Quantile MTF showed completely identical picture.

Decision

  • Do future investigation for journal writing.

Risk

  • Gonna go fast.

Next

  • More investigation.

2026-05-12

project

Research monitoring & adjusting.

Done

  • Core run complete with lower than baseline performance.

Decision

  • Investigate problem and improve.

Risk

  • Might cost my paper can publish.

Next

  • Define the problem is in the method or data processing flow.

2026-05-11

Project

UEvolve implementation:

  • Scoped a closed-loop RAG workflow connecting indexing, retrieval, decision evidence, and knowledge write-back.
  • Scoped a self-extension validator to check scaffold, schema, tests, dry-run apply, build, execution, and rollback.
  • Scoped an export/import package flow for sharing self-generated tools as validated distributable packages.

Research experiments.

Done

  • RAG part is finished and tested, PR is merged
  • Experiment 2 core runs is up and running.

Decision

  • Do more research things

Risk

  • Journal won’t be in time at this rate.

Next

  • EDA-Augmented CCT-LSTM evaluation experiment part 2.

2026-05-10

Project

UEvolve vibe coding

Done

  • Reviewed the project with Meng.
  • Had plan for next steps.

Decision

  • Collaborate with Meng on the implementation of the UEvolve.
  • Defined a parallel plan for multi-agent orchestration.

Risk

  • Research is remain the first priority.
  • Implementation may take more time than expected, which could delay the research progress.

Next

  • Start implementing the UEvolve based on the defined plan.
  • Continue with the research experiments in parallel.

2026-05-08

Project

Paper writing

Done

  • Whole paper review and polishing.
  • Paper sent to professor for submission.

Decision

  • None

Risk

  • None

Next

  • Submit the paper.
  • Prepare for next experiments.
  • Review past exam question sets.
  • Plan next research projects.
  • Practice English.
  • Get Korea’s visa.(After passport renewal)

2026-05-07

Project

Paper writing

Done

  • Paper method section EDA-argumentation part.
  • Paper evaluation protocol description part.

Decision

  • None

Risk

  • None

Next

  • Finish the paper.

2026-05-06

Project

K.I.C.S. Paper writing

Done

  • Paper method section paper reproduction part.

Decision

  • None

Risk

  • Paper might be a little too long.

Next

  • Finish the paper.

2026-05-05

Project

Paper writing / experiment results review.

Done

  • Paper related work section.
  • Reviewed all clean p128 results for P1-P8.

Decision

  • K.I.C.S. paper should only include P0/3/4.

Risk

  • Deadline is close.

Next

  • Finish method and experiment sections.
  • Prepare for submission.

2026-05-01

Project

Paper writing

Done

  • Paper introduction.

Decision

  • None

Risk

  • Intro and abstract are little too long and may need to be shortened.

Next

  • Finish the related work section, then move on to method and experiment sections.
This post is licensed under CC BY 4.0 by the author.